The estimate, the schedule, the risk and the portfolio in one connected model, so executives see every project the way the schedule sees it.
Stop reconciling spreadsheets. Start deciding. Budget, earned value and actuals roll up live from every schedule in the workspace, so the cash flow, SPI and CPI in the boardroom are the same numbers the planners work from. See which projects need attention this week, what the forecast finish will cost, and what it takes to bring it back.
Owners run many projects with few planners. Deltasys keeps the estimate, the schedule and the performance figures in one model, so the numbers at the executive table are the numbers the planner is working from.
Six capabilities on one model. Each is a view of the same projects, so there is nothing to reconcile.

KPIs, cash flow, manpower, timeline and health across every project, grouped on two levels by division, OBS, portfolio, client or status.

WBS, activities, logic and constraints on a critical path engine verified against the industry's leading scheduler, with calendars, resources, leveling and layouts.

Classed estimates with rate build-ups, quantities, benchmarks, quotes and a basis of estimate, handed to the schedule as a resource-loaded baseline.

PV, EV, AC, SPI, CPI, EAC and TCPI from the schedule and the actuals, period by period, with recorded updates and S-curves.

Cash flow and manpower forecasts, Monte Carlo schedule and cost risk with a register, P-dates and drivers, across the portfolio.

Change requests modelled as what-if scenarios before approval, a full change log, and printable report packs for the project and the portfolio.
Monte Carlo simulation samples every estimate and the register's risk events and reschedules the whole network each iteration, so the P-dates and the cost at completion come from the same logic, calendars and constraints the plan is built on.



Three-point estimates by activity or in bulk, correlation within a WBS, risk factors and weather calendars, probabilistic branches and links, cost uncertainty on rates and expenses.
The contingency a P80 date needs, which activities and risks drive the spread, how much a response buys, and a printable risk report with the register and the distributions.
Runs before and after responses, with and without a change, are saved as scenarios and compared on one chart.
A finish date is a prediction. Deltasys treats it as one: several families of model, each suited to a different question, run on the live schedule, the actuals and the history of your own projects, and every answer comes with its range and the drivers behind it.
Monte Carlo over durations, costs, risk events and weather. Thousands of reschedules give the finish and cost distributions, P50, P80 and P90, and the drivers.
"What date can we commit to at 80 percent confidence?"
Earned value extrapolation: the cost and the date the current SPI, CPI and schedule-cost indices lead to, with TCPI and the window of outcomes between them.
"If we keep performing like this, where do we land?"
Change a scope, a crew, a start or a logic tie and the engine reschedules, levels and re-forecasts the whole project before anyone approves the change.
"What happens to the outage if the parts arrive two weeks late?"
Gradient-boosted and neural models trained on your completed projects: how durations, productivity and change really behaved by discipline, crew and season, so new estimates start calibrated.
"How long do our piping tie-ins actually take?"
Statistical and learned models fitted to the recorded S-curves, cash flow and manpower, projecting each period forward with a confidence band and flagging departures from the baseline early.
"Are we slipping, or is this normal for month four?"
A large language model reads the schedule, the risk run and the period's changes, checks logic and resourcing against planning practice, and drafts the forecast narrative for the report pack with every figure traced to the model that produced it.
"Explain this month's forecast to the steering committee."
Every forecast reschedules the real network with its logic, calendars and constraints. Nothing is predicted from a spreadsheet of dates.
Each figure comes with the activities, risks and assumptions that moved it, and the inputs are visible and editable.
Historical models train only on your workspace. Your data is not pooled with anyone else's and never leaves your deployment.
Models propose, people approve. Forecasts are recorded by period with the method used, so each one can be audited later.
Engine timings measured on the development workstation; scheduler agreement measured on a reference set of projects scheduled in the industry-standard enterprise scheduling software. Your results depend on your projects and hardware.
Deltasys is for the firms that engineer and build capital projects and for the owners who answer for them: to a regulator, a customer, a board or the public. The common thread is accountability for the baseline, the forecast and every change in between.
EPC, EPCM and general contractors who bid on a classed estimate, deliver on a resource-loaded schedule and report earned value to the owner every month. One model from the tender to the final account, exchanged with the owner's scheduler as XER.
Firms that plan, estimate and control projects on a client's behalf, across many clients at once. A workspace per client, classed estimates with a documented basis, independent schedule review and risk analysis, and report packs ready for the steering committee.
Programmes reviewed against NASA and ESA lifecycle gates, where a slipped milestone is a public event and every forecast is challenged. Integrated baselines, risk-adjusted dates and traceable change.
Contracts that report earned value to the customer every month, with surveillance of the baseline and the change process. One model from estimate to EAC, with the history to show.
Planned outages measured in hours, refurbishments measured in years, and a regulator on site. Outage calendars, dose-constrained work, risk runs on the critical path and a portfolio of units.
Substations, lines, hydro and generation renewal across many sites and divisions, with rate-case scrutiny on every dollar. Division and OBS roll-ups and classed estimates behind each project.
Hyperscale and colocation builds where a week of delay is a contract penalty and the long-lead equipment drives everything. Procurement milestones, commissioning logic and what-if on the delivery dates.
Capital programmes answerable to councils, treasury boards and auditors. An executive view that comes straight from the schedules, with the estimate basis stated on every project.
Turnarounds, pipeline and terminal projects with strict shutdown windows and contractor crews. Timecards by activity, contractor cost actuals and cross-project links between the turnaround and the capital work.
Remote sites, seasonal access and commodity-driven go or no-go decisions. Weather calendars in the risk run, quantity-based progress and a portfolio view across operations.
Validated facilities where the commissioning and qualification sequence is the schedule, and change must be documented. Steps and rules of credit, change requests with history, printable packs.
Multi-year programmes with possession windows, many contractors and a public timetable. Calendar exceptions, XER exchange with contractors and a portfolio timeline against the baseline.
Municipal and regional capital plans with dozens of mid-sized projects and a small controls team. One planner can keep every project current and the council's report pack ready.
Rate ramps, tooling and facility programmes tied to delivery commitments. Resource-loaded baselines, timesheets from the floor and earned value by work package.
Deltasys is built around the methods these programmes are measured by, so the figures in the review are the figures the method expects.
Standards and guides are named to describe the practices the product supports; no certification, accreditation or endorsement by any body is claimed.
A few of the views planners and executives work in. All of them read the same projects; none of them is a report built on the side.
























Each stage reads the one before it. The estimate becomes the baseline, progress updates the forecast, and the portfolio totals the lot. The same numbers at every level.
Rate build-ups, quantities, a risk log and a basis of estimate, Class 5 to Class 1.
WBS, logic, calendars, crews and limits; leveled; baselined; the critical path verified.
Updates to a new data date, SPI and CPI, forecasts, what-if scenarios, change requests, risk runs.
Cash flow, manpower, health and estimate basis across every project, with the report pack.
Deltasys exchanges schedules with the industry's leading enterprise scheduling software through the standard XER format: projects, calendars, WBS, activities, relationships, resources, assignments, expenses, activity codes and steps. Schedules round-trip, and the critical path results match on the same inputs. Estimates come in from spreadsheets and bills of material, and every table leaves as CSV or Excel.
Most owners run Primavera P6 or P6 EPPM, or Microsoft Project. Both were built for a different era and a different user. Deltasys was built for owners who need the estimate, the schedule, the actuals, the risk and the portfolio in one place, in the browser, this afternoon.
| What you need | Deltasys | Primavera P6 / P6 EPPM | Microsoft Project |
|---|---|---|---|
| Runs in the browser, nothing to install or administer | Yes | Web client needs servers and administration | Desktop; server edition for sharing |
| Critical path scheduling with calendars, resources, leveling, codes | Yes, verified against P6 results | Yes | Yes, simpler |
| Estimate in the same model, handed over as the baseline | Yes, classed Class 5 to 1 | Separate product or spreadsheet | No |
| Earned value: PV, EV, AC, SPI, CPI, EAC, TCPI by period | Yes, with recorded updates and thresholds | Figures; reporting elsewhere | Basic columns |
| Timesheets by project activity with approval | Yes, Time Control | Separate module | No |
| Monte Carlo schedule and cost risk, register, P-dates | Yes, built in | Separate product | No |
| Change requests modelled as scenarios before approval | Yes | No | No |
| Portfolio roll-up: cash flow, manpower, KPIs by division and OBS | Yes, live from the schedules | EPPM dashboards, more licences | Server edition |
| XER exchange with the rest of the industry | Import and export, multi-project | Native | No |
| An assistant that reads the live project | Yes | No | No |
| Licensing | Free during the beta; per seat after, executives included | Per seat plus annual support; modules extra | Per user; server edition extra |
Comparison based on each product's published documentation and typical deployments as we understand them at the time of writing; capabilities and licensing vary by edition and change over time. Primavera and P6 are trademarks of Oracle Corporation; Microsoft Project is a trademark of Microsoft Corporation. No affiliation or endorsement is implied.
Nobody rebuilds a programme to change software. The switch runs alongside what you have, one project at a time, with the enterprise system still the record until you decide otherwise.
Projects, calendars, WBS, activities, logic, resources, assignments, codes and steps come in as they are. Check the dates against your scheduler: they match.
Update progress, load actuals, run the risk analysis and the executive dashboard in Deltasys for a period. Export the XER back so the record stays whole.
Add the estimate and its class, the timesheets, the risk register and the change requests. This is what the old tool never held.
Keep a seat or two for exchange with contractors if you want; move the planners, the field and the boardroom to Deltasys.
A schedule is only as good as the actuals behind it. Deltasys takes cost, commitment, timesheet and progress data from your ERP, finance and field systems, and sends forecasts, cash flow and earned value back out, so the project controls numbers and the finance numbers are the same numbers.
General ledger, project accounting and procurement systems.
The industry's leading enterprise schedulers, through the standard XER format.
Cost databases, quantity takeoff and bid systems.
Timekeeping, crew management and progress capture.
Engineering document and drawing registers.
Dashboards and data warehouses.
XER for schedules, Excel and CSV for everything else. Column mappings for an ERP export are saved and reused every period.
Read and write projects, enterprise setup and workspace members as JSON. Every write carries a version, so two systems never overwrite each other silently.
For enterprise deployments we build and run the connector to your finance system on your schedule, with field mapping, reconciliation and an audit trail of every load.
Connections to these systems use their standard export and import formats or published interfaces. Product names are the property of their respective owners; no affiliation, sponsorship or endorsement is implied.
Deltasys is in beta. Every workspace is free while the platform is finished; paid plans will be announced with notice, and nothing you build is locked in.
Yes. Deltasys is a project controls platform that works alongside the industry's leading enterprise scheduling software. Schedules move both ways as XER files, and the critical path results match on the same inputs. Many owners keep their existing system as the enterprise record and use Deltasys for the planning, estimating, performance and portfolio work around it.
Yes: the demo opens in the browser with seven illustrative projects, and you can browse every window, panel and report. Making changes, opening your own files and creating projects need a free account, which takes a minute.
In your browser and, with a folder, in autosave files with daily backups. With a cloud workspace, projects are also kept on the Deltasys server in Toronto, Canada, shared with the members you invite.
Yes. It keeps working without a connection; a cloud workspace syncs when you are back online, and a newer version saved by someone else is never overwritten silently.
Each iteration samples a duration for every activity from its three-point estimate (triangle, BetaPERT or uniform), applies correlation, risk factors, weather and the register's events that occur in that iteration, and reschedules the network with its logic, calendars and constraints. Thousands of iterations give the finish and cost distributions, the percentiles, each activity's criticality and sensitivity, and the cash-flow bands. Latin hypercube sampling and a fixed seed make a run repeatable.
A statement of how well defined the scope was when the estimate was made, from Class 5 at concept screening to Class 1 at detailed design, in the manner of the AACE International classification practice. Deltasys records the class of the estimate and of the schedule on every project and flags any mismatch.
Yes. Calendars with shifts and holidays, resource crews and limits, leveling, baselines, progress updates and risk analysis cover outage and turnaround planning as well as capital projects.

Scheduling, resources, baselines, progress, earned value, risk and change for every project.
Open the Planner with demo data →
Classed estimates with rate build-ups, quantities, rules of credit and a basis of estimate, handed to the Planner as a baseline.
Open the Estimator with a sample estimate →
Timecards by project activity for everyone onboarded to a project, approved weekly, flowing into the Planner's actuals.
Open Time Control →
The executive window: KPIs, cash flow, manpower, timeline, estimate basis and the report pack across the workspace.
Open the Portfolio with demo data →Start in the browser today, or tell us about your projects and we will reply within one business day. No sales sequence, just a planner who can answer the question.
Prefer email? hello@pgrdelta.com